The structure decides what questions you can answer later

If concrete supply and concrete placing sit under one cost centre, you can never separate them without going through the bill line by line. If they are separate, you get both numbers for free — on every job, forever.

Available on the Estimator plan and above

app.smartebuild.com.au/costcenters
The cost centre structure in SmarteBuild, listing trades with their codes.
Every BOQ item sits under one of these.
Why it matters more than it looks

Four things read from it

Cost centres turn a long list of priced lines into something you can read a total off, compare between jobs and issue orders from.

Purchase orders
Grouped by cost centre, so the structure decides how naturally an order maps onto one subcontractor’s scope.
Cost reports
Report by cost centre. If two things share one, you can never separate them again without going line by line.
Progress claims and expenses
Both coded to them.
Comparing jobs
Only works if the jobs share a structure.

That last one is what people wish they had known earlier. Two jobs with different structures cannot be compared without manual work — so a structure you keep changing costs you your own history.

Work breakdown structures

Most builders need one. Some need three.

A work breakdown structure is a named cost centre tree. If none of the situations opposite apply to you, one structure is the right answer — and keeping several will only cost you the consistency that makes them worth having.

If your team keeps building costings on the wrong structure, the fix is nearly always theDefault WBS for new Costings setting on the project, not more training.

When more than one structure is worth having
You doYou might want
New builds and renovationsA structure for each — renovations carry demolition and make-good that a new build has no line for
Residential and commercialSeparate structures; commercial usually needs more depth
Work for a builder who mandates their codesTheir structure alongside your own
Volume and custom homesA tight volume structure, a fuller custom one

Set it up once, reuse it forever

A structure built carefully on job one is still paying you back on job forty — because every one of those jobs is comparable with every other. That is the return, and it only arrives if you stop changing it.

A closer look at cost centres

The structure itself, where it is set, and what it gives you back.

A cost centre structure showing trades and their sub-levels.
The trade breakdown, in full
The Work Breakdown Structures tab on a project, with a default set for new costings.
Which structures a project can use
A cost report grouped by cost centre with trade subtotals.
What the structure buys you later

What it connects to

Nothing in SmarteBuild is an island — that is the point of it. Cost Centres & WBS reads from and feeds into these.

Want the detail?

The help centre documents Cost Centres & WBS step by step, with worked examples — written for people using it, not for a brochure.