Four weeks late with eleven recorded wet days is a different conversation

A job four weeks behind for no recorded reason looks like incompetence. The same job with eleven wet days in the diary is weather — and weather is usually an extension of time. The site diary is the cheapest insurance on a building job, and it only works if it is written on the day.

Available on the Builder plan

app.smartebuild.com.au/sitediary
The site diary for a job, showing a month of days with delays, weather and photo counts against each.
A month of the job, and every day that cost you time.
Three reasons, in increasing order of money

It is evidence, and it is the only evidence that will exist

It explains the programme

When the client asks why handover moved, a diary answers in specifics rather than impressions. Eleven wet days is a fact. "It was a bad winter" is not.

It supports extensions of time

Most building contracts allow an extension for delays outside your control, and nearly all require notice within a set period. A contemporaneous record is what makes that claim work.

It supports compensable delay

A delay caused by a client's late decision or a design change is often chargeable. The diary is the evidence. Reconstructed from memory, it is worth very little.

A diary written later is not a diary. Its whole value is in being contemporaneous. Written up on Friday from memory, it records what you now believe happened — which is worth almost nothing when the point of the exercise is proving what did.

Recorded for you

The weather is on the day before you write anything

Wet-weather delay is the most commonly claimed and the most commonly disputed. A recorded delay sitting next to the recorded conditions for that date is a far stronger position than a note saying it rained.

SmarteBuild takes the weather from the site address, not from your office — which matters the moment you have two jobs an hour apart and only one of them got the storm.

The weather panel on a diary day, showing conditions and rainfall for the site address.
One day

Enough structure to be useful, little enough to be finished

Every section is optional. A quiet day is three taps. A bad one is where the detail earns its keep.

Delay today is the headline figure — how much time the job actually lost — and it is the number the claim is eventually built on.

What a day holds

Project team on site
Your own people
Subcontractors on site
Which trades, and how many
Visitors register
The client, a surveyor, an inspector, anyone else
Deliveries
What arrived, and from whom
Project delays
Time lost, and the reason
Issues
Anything affecting cost or programme
Notes and photos
Everything else, with captions

It gets written on the phone, or it does not get written

The diary that exists is the one filled in standing on site while the concrete truck leaves. The desktop is for reviewing a run of days, printing one as a formal diary form, and pulling the delays together when it is time to claim.

A closer look at the site diary

One day, a fortnight of them, and the version that gets printed.

A completed site diary day on the desktop showing trades, deliveries, delays and the weather.
A day, complete, weather and all
A run of diary days with recorded delays and their reasons.
A fortnight, and where the time went
A site diary day printed as a formal diary form.
The version that goes in the contract file

What it connects to

Nothing in SmarteBuild is an island — that is the point of it. Site Diary reads from and feeds into these.

Want the detail?

The help centre documents Site Diary step by step, with worked examples — written for people using it, not for a brochure.

Start with one job and see

Try the whole thing free for 30 days. No credit card to start, and no lock-in contract.