SmarteBuild
Running the job New

Hand the house over properly, and have the paperwork to prove it

The last day of a job is the one a client remembers. House Handover takes you from the pre-handover inspection to the keys in their hand: the defects in view, the checklist ticked off together, their signature on a tablet, and a certificate filed with the job.

Available on the Builder plan

app.smartebuild.com.au/handover
The house handover page for one house: the steps from inspection booked to handed over, then the Defects, Checklist, Paper form and Other checklists tabs, with two open defects listed from Defects.
One page per house, with the job's open defects in view.
Where it stands

Five steps, each with a date and a name

Every house moves through the same steps, and each one records the day and who recorded it. So when someone asks whether the inspection happened, the answer is on the page.

The defects on the page come straight from Defects. Nothing is copied. Tick one fixed on the walk-through and it is fixed in Defects too.

The steps

Not ready
Nothing has happened yet.
Inspection booked
The day you will walk the house with the client.
Inspected
Done, with a note of who was there.
Ready to hand over
The house is ready. Open defects show as a warning, never a block.
Handed over
Your client has signed, on screen or on a signed paper form.
The handover checklist

The things that get forgotten on the day

Your company keeps one handover checklist. Each house gets its own copy, so you can add or take out items for that house without changing anyone else's. Go through it with the client and press Done or Not applicable as you go. It saves as you tap.

Meter readings are typed as the meter shows them, leading zeros and all. You can hand over with an item unanswered. You are warned first, and it prints on the certificate as "Not answered at handover".

  • Keys and remote controls
  • Electricity, water and gas meter readings
  • Manuals and warranties
  • Appliances shown
  • Smoke alarms tested
  • Letterbox key
  • Pool safety certificate
  • Garage remote codes
Handing over

Signed on the day, by the person who took the keys

On a phone or tablet

Press Hand over. The date starts at the contract's practical completion stage, and Received by starts with your client's name. They sign with a finger, a pen or the mouse.

Or on paper

No tablet on site? Print the form, have it signed by hand, then add a photo or scan of it. The signed form counts as the signature and is kept with the job's documents.

Open defects don't stop you

If something is still open, you type why, for example "agreed to finish the shower screen next week". Those defects stay open and print on the certificate as "to finish after handover".

The certificate

A handover certificate, filed for you

Once handed over, the certificate is one click away as a PDF: the job and address, the date, who received the house and their signature, who handed it over, the checklist with the meter readings, and any defects still to finish. A copy goes into the job's Documents, in a Handover folder.

Undoing a handover needs its own permission, which nobody has until an administrator gives it, and a reason. The reason, who and when stay on the page.

After the keys

The defects liability period, with a reminder before it ends

The handover date starts a 12-month defects liability period. Its end date shows on the certificate and on your client's portal. Thirty days before it ends, the people who record handovers on that job get a reminder, so the final defects visit gets booked.

Your client

A Handover tab on their portal

Your client's portal shows where the handover stands, the inspection and handover dates, who received the keys, how many defects are to finish, and the certificate to download. You can hide the tab for a job if you prefer. What your client sees →

Every house coming up for handover, on one list

The All jobs list shows every house with a handover started or practical completion due in the next 30 days: due soon, open defects, ready, handed over, and defects periods ending. The Dashboard has the same figures on a House handovers card.

A closer look at handover

The signature, the checklist, and the house handed over.

The Hand over the house window: the date, Received by Mia Torres, a signature in the box, and the reason for handing over with one open defect.
Signed on the day, with the reason for the open defect
The handover checklist: keys and remote controls done, electricity and water meter readings typed in, and the rest of the items still to answer.
The checklist, meter readings and all
A house handed over: each step with its date and who recorded it, the client’s signature, the open defect agreed to finish later, the 12-month defects liability period with its reminder, and the Certificate (PDF) button.
Handed over, with the certificate a click away

What it connects to

Nothing in SmarteBuild is an island — that is the point of it. House Handover reads from and feeds into these.

Want the detail?

The help centre documents House Handover step by step, with worked examples — written for people using it, not for a brochure.

Start with one job and see

Try the whole thing free for 30 days. No credit card to start, and no lock-in contract.